The Solar ATAP Program in Malaysia
Solar Accelerated Transition Action Programme — replacing NEM, so you use your own solar electricity first, with any surplus credited. Arus EnerG manages your application end-to-end as an SEDA-registered RPVSP.
What Is Solar ATAP?
Malaysia’s official government scheme for installing rooftop solar panels, replacing Net Energy Metering (NEM), which ended on 30 June 2025. Solar ATAP took effect on 1 January 2026.

Solar ATAP vs NEM — What’s the Difference?
| NEM (ended 30/6/2025) | Solar ATAP (from 1/1/2026) | |
|---|---|---|
| Status | Closed, no new registrations | Active, applications open now |
| Mechanism | Net metering, unit-for-unit offset | Self-consumption first + export surplus credit |
| Additional incentive | No special cash rebate | SuRIA Home rebate up to RM3,000 |
| Residential capacity limit | Varied by program phase | 5kW (single-phase) / 15kW (three-phase) |
| Export credit balance | Can be carried to the next month | Expires every month — right-sizing matters |
Are You Eligible?
You need to meet all of the following requirements to qualify for Solar ATAP:
- Registered TNB consumer in Peninsular Malaysia
- Not currently registered under the Self-Consumption or NEM scheme
- Not a co-generator, back-feeder, or holder of a multi-tenant sub-meter account
| User Type | Maximum Capacity Limit |
|---|---|
| Residential (single-phase) | 5 kW |
| Residential (three-phase) | 15 kW |
| Non-residential | 100% Maximum Demand, capped at 1,000 kW |
SuRIA Home Rebate — Up to RM3,000
For residential consumers who install rooftop solar through Solar ATAP.
- RM600 for every 1kWac, up to a maximum of RM3,000
- Phased rollout from 1 June to 31 December 2026, first-come-first-served
- System must be commissioned before 31 December 2026, or until the quota runs out — whichever comes first
- Eligible consumers will be contacted via their registered TNB email with bank account details
For Companies & Businesses: GITA & GITE
Tax incentives administered through the Malaysian Green Technology and Climate Change Corporation (MGTC) and the Malaysian Investment Development Authority (MIDA).
| Incentive | Rate | Duration / Requirement |
|---|---|---|
| GITA Asset (self-consumption) | 60% Investment Tax Allowance, offset against up to 70% of annual statutory income | Application via MGTC within 24 months of the capital expenditure date |
| GITA Project (RE core business) | 100% Investment Tax Allowance, offset against up to 70% of annual statutory income | 5 years. Application must be made before the first capital expenditure |
| GITE Solar Leasing | Tax exemption of up to 70% of statutory income | 5 years (3–10MW) / 10 years (10–30MW) |
Companies with 1MW+ demand and RE100/ESG targets should also look at CRESS (buy solar electricity directly without installing your own panels) and GTFS 5.0 (60-80% government guarantee on commercial solar bank loans).

Calculate Your Savings Estimate
Enter your monthly TNB bill to get an estimate of your system size and savings — in just a few seconds.
Kalkulator Penjimatan Solar ATAP
Kira anggaran penjanaan solar, penggunaan terus, eksport ATAP, Caj Pelarasan Insentif Cekap Tenaga dan nett bil selepas solar.
Maklumat Penggunaan Elektrik
Maklumat Sistem Solar
Jika baki import selepas solar melebihi 1,500 kWh, kadar eksport ialah RM0.37/kWh.
Jika baki import selepas solar ialah 1,500 kWh atau kurang, kadar eksport ialah RM0.27/kWh.
Kadar ditentukan berdasarkan baki import TNB selepas penggunaan solar secara terus.
Pecahan Pengiraan Bulanan
Perbandingan Bil
Lihat Jadual Caj Pelarasan Insentif Cekap Tenaga
| Jumlah Eksport Bulanan | Kadar |
|---|---|
| 1–200 kWh | 25.00 sen/kWh |
| 201–250 kWh | 24.50 sen/kWh |
| 251–300 kWh | 22.50 sen/kWh |
| 301–350 kWh | 21.00 sen/kWh |
| 351–400 kWh | 17.00 sen/kWh |
| 401–450 kWh | 14.50 sen/kWh |
| 451–500 kWh | 12.00 sen/kWh |
| 501–550 kWh | 10.50 sen/kWh |
| 551–600 kWh | 9.00 sen/kWh |
| 601–650 kWh | 7.50 sen/kWh |
| 651–700 kWh | 5.50 sen/kWh |
| 701–750 kWh | 4.50 sen/kWh |
| 751–800 kWh | 4.00 sen/kWh |
| 801–850 kWh | 2.50 sen/kWh |
| 851–900 kWh | 1.00 sen/kWh |
| 901–1,000 kWh | 0.50 sen/kWh |
| Lebih 1,000 kWh | 0.50 sen/kWh |
Kadar pelarasan digunakan sebagai kadar rata berdasarkan jumlah keseluruhan eksport bulanan.
How to Apply for Solar ATAP
Appoint an RPVSPAn officially SEDA-registered solar company — Arus EnerG is one of them.
eATAP ApplicationYour RPVSP manages everything end-to-end through the eATAP portal (atap.seda.gov.my).
Technical AssessmentCarried out if required, depending on your system’s voltage/capacity.
10-Year ContractYour Solar ATAP contract takes effect as soon as it’s approved.
Frequently Asked Questions
I already registered for NEM — am I automatically enrolled in Solar ATAP?
Not automatically. NEM has ended, and one of the conditions for Solar ATAP is that the applicant must not currently be registered under NEM/Self-Consumption — you’ll need to check your account status with TNB/your RPVSP first.
How long does Solar ATAP approval take?
It depends on your system’s capacity and voltage — small residential systems (5kW single-phase) are usually faster since they don’t require a full Power System Study.
What is an RPVSP, and why is it mandatory?
Registered PV Service Provider — a solar company certified by SEDA to legitimately manage Solar ATAP applications. You can’t apply on your own without an RPVSP.
Is the RM3,000 rebate automatic, or do I need to apply?
Based on the official announcement, eligible consumers will be contacted by TNB via their registered email — it isn’t self-service, but make sure your TNB email address is up to date.
Why does the export credit expire every month?
This is the key difference from NEM — Solar ATAP doesn’t carry credit balances over to the next month. That’s why getting the system sized correctly (not oversized) matters, so your exported surplus isn’t wasted.
Is Solar ATAP available for businesses/commercial use too?
Yes — non-residential users are eligible for up to 100% Maximum Demand, capped at 1,000kW, subject to technical assessment.
Real Arus EnerG Installations
A selection of the Solar ATAP projects we’ve completed for customers across Peninsular Malaysia.


Ready to Get Started?
Free site assessment, no obligation. Our team will help check your eligibility and manage your eATAP application.